How Well Is Waterproofing Done in a Pre-Sale Home Bathroom, and How Should It Be Inspected Before Handover?

Bathroom waterproofing can be checked through the contract's warranty period and the inspection before handover, while the duration and water depth of water tests are practices used by developers.

How Well Is Waterproofing Done in a Pre-Sale Home Bathroom, and How Should It Be Inspected Before Handover?
In three sentences
  1. To ensure bathroom waterproofing in a pre-sale home, check the contract's warranty terms and inspect the unit before handover. The Ministry of the Interior sets leak warranties of 15 years or 1 year depending on the component.
  2. 100 Interior Design and the TWProbe Real Estate Observation Station say that before tiling, the area should be filled with water and left to stand for 24 to 48 hours to check for leaks.
  3. A consumer protection officer at the Legal Affairs Bureau of the Taichung City Government reminds buyers to inspect the unit before handover and to request an inspection form, a building material and equipment schedule, and other drawings and documents from the developer.

The warranty period is the clearest basis for home buyers. Under Point 17, Paragraph 1 of the Ministry of the Interior's “Required and Prohibited Items in Pre-Sale Home Sales Standard Contracts,” the seller guarantees structural parts (foundations, beams and columns, load-bearing walls, floor slabs, roofs, stairs, retaining walls, etc.) for 15 years, and fixed building materials and equipment (doors and windows, plastering, floor tiles, etc.) for 1 year. A Ministry of the Interior letter dated May 21, ROC Year 98 (2009) further explains that leaks in structural parts are warranted for 15 years, and leaks in fixed building materials and equipment are warranted for 1 year.

If the seller adds a “leak warranty” (titled “waterproofing warranty” in the letter) to the contract, the warranty period may not be shorter than the period required by the standard for the structural or fixed building materials and equipment. Whether a leak warranty is 15 years or 1 year depends on which category the leaking part belongs to, so buyers can ask the developer to state this clearly in the contract before signing.

For the handover inspection, the consumer protection officer at the Taichung City Government Legal Affairs Bureau recommends checking that building materials and equipment match the building material and equipment schedule in the contract. Plumbing and pipes must be tested, with water pressure in the bathroom and kitchen turned to maximum, and the toilet should be tested for proper flushing and any leaks. The 158 Spatial Information Network of the Taichung City Government Land Administration Bureau also offers downloads of the pre-sale home standard contracts that developers have filed for record, where buyers can check building materials and equipment, handover deadlines, and warranty terms.

As for water tests, the figures given by developers are not entirely consistent. 100 Interior Design says that after the waterproof layer is finished and before floor tiles are laid, the bathroom, balcony, and other areas should be flooded to a maximum depth of 2 to 3 centimeters, with the drains sealed, and tested for 24 to 48 hours. It adds that most professional standards recommend at least 24 hours, and 48 hours is safer. The TWProbe Real Estate Observation Station states that the area should be filled to a depth of 3 to 5 centimeters and left to stand for 48 hours, that the waterproof layer in the shower area should reach a height of at least 180 centimeters, and that the washbasin area should be at least 100 centimeters. The process used by absco involves adding about 3 to 5 centimeters of water, recording the initial water level and taking photos, checking every 12 hours, and confirming at the end that the water level has not dropped noticeably and that there are no signs of leaks in the unit below or in neighboring walls.

These water test practices are developers' own claims that address the construction stage before tiling. They are not official requirements. The TWProbe Real Estate Observation Station also notes that flexible cement waterproofing coating should be applied in 2 to 3 layers in a crisscross pattern, with a total thickness of 1.2mm to 1.5mm, and should not be applied thickly in a single coat.

What it means for you

Before signing, review the contract's warranty terms and the building material and equipment schedule, and ask the developer to state the leak warranty period clearly in writing. Before handover, request the inspection form, the building material and equipment schedule, and the plumbing and fixture layout drawings. During the inspection, turn the bathroom water pressure to maximum and test whether the toilet flushes properly and has no leaks. To learn about waterproofing work, you can ask whether the developer conducted water tests and request water level records and photos.

Quick quiz

2 questions; pick an answer to see the explanation

  1. Under the Ministry of the Interior's standard contract requirements for pre-sale homes, how many years does the seller guarantee fixed building materials and equipment?
  2. According to the TWProbe Real Estate Observation Station, how high should the waterproof layer in a bathroom shower area be?

Image cards

6 cards. Tap to enlarge; save and share with friends

Pre-sale home bathroom waterproofing inspection. If the bathroom leaks, how many years of warranty does the developer provide?
How is the water test done before tiling?
What should be checked during the inspection before handover?
Card 1
How many years is the leak warranty? Structure: 15 years; building materials and equipment: 1 year. Structural parts (beams, columns, floor slabs, roofs, etc.): 15-year warranty; fixed building materials and equipment (doors and windows, plastering, floor tiles, etc.): 1-year warranty; the seller may add a “leak warranty,” and its term may not be shorter than the term for the corresponding item
Card 2
Check before signing: review these two places in the contract first. Review the warranty terms and building material and equipment schedule in the contract; ask the developer to state the leak warranty period clearly; the 158 Spatial Information Network of the Taichung City Government Land Administration Bureau allows you to download filed contracts
Card 3
Water tests during construction: check by filling with water before tiling. 100 Interior Design: fill to 2-3 cm and test for 24-48 hours; TWProbe: fill to 3-5 cm and let stand for 48 hours; absco: check every 12 hours and take photos
Card 4
Inspection before handover: always inspect the unit before handover. Taichung City consumer protection officer: always inspect before handover; request the inspection form, building material and equipment schedule, and plumbing and fixture layout drawings; test the bathroom and kitchen with water pressure at maximum; test whether the toilet flushes properly and has no leaks
Card 5
Questions to ask the developer: 1. What is the leak warranty period in the contract, and where is the scope written? 2. Can I get the inspection form, building material and equipment schedule, and plumbing and fixture layout drawings before handover? 3. Did the bathroom waterproofing work include a water test? Can you provide water level records and photos? Please keep written or photo records of the developer's answers.
Card 6

Original:桃園市政府地政局 · We only post summaries and key points. Read the original for the full story.

This week’s news, sorted for you

One Uchily newsletter a week, picking out what actually affects your wallet.

Subscribing creates a Uchily account with this email; open the link in the email to finish. You can unsubscribe from any email.

Games

Real estate jargon, translated into plain words in three choices

The agent says「This one’s in demand. Someone made an offer just yesterday.」What it really means:

How Well Is Waterproofing Done in a Pre-Sale Home Bathroom, and How Should It Be Inspected Before Handover? · Uchily